Goldlauter
Prison
Suhl Prison in the Goldlauter district on the southern slope of the German Thuringian Forest has been in operation since 1991. The four to five-storey facility has a total of 282 places for male prisoners in closed and open custody. In 2023, the detention room and passage door locks that had been used for decades were replaced with new HSL-C system locks as part of maintenance.
Location | Suhl, Germany |
Room / Door | Passage door, Detention room door, Outer gate, Food Hatch, Extra-secured detention door |
Solutions | Correctional Services |
Product series | HSL C High Security Locks |
Service | Delivery |
Wittlich Correctional Facility
With a total of 856 prison places, Wittlich Prison is the largest prison in Rhineland-Palatinate (Germany). During the almost four-year construction period, a new detention centre, a new gate, a new administration building and a 900-metre-long defence wall were built at a cost of 70 million euros. In addition, the new building has, among other things, a judge's chambers with video transmission possibilities to other courts. Wittlich accommodates men in open and closed custody from the district court districts of Koblenz and Trier.
Location | Wittlich, Germany |
Room / Door | Passage door, Detention room door, Outer gate, Food Hatch, Airlock door, Extra-secured detention door, Main entrance door, Service door |
Solutions | Correctional Services |
Product series | HSL High security locks |
Service | Delivery |
Landshut Prison
The foundation stone for the new prison building in Landshut (Bavaria, Germany) with 515 places and 36 places for youth detention was laid on 22 April 2002. The first two construction phases of the new prison were completed in 2007. The third construction phase was completed in March 2010 and includes an annex for remand prisoners. The new building on the outskirts of the Lower Bavarian district capital, which cost almost 73 million euros, replaces the approximately 100-year-old detention centre in the centre of Landshut.
Location | Landshut, Germany |
Room / Door | Detention room door, Extra-secured detention door |
Solutions | Pre-trial Detention, Correctional Services, Juvenile Correctional System |
Product series | HSL High security locks |
Service | Delivery |
Würzburg Police Station
For around 18.8 million euros, the Würzburg-Stadt police station (Bavaria, Germany) was almost completely gutted, completely renovated and extended. The listed main building from the 1950s is now complemented by a new two- and three-storey extension. The ground floor houses the police station with its service groups, the upper floors offices with a multifunctional room. The basement mainly houses technical and changing rooms as well as the detention rooms.
Location | Würzburg, Germany |
Room / Door | Extra-secured detention door |
Solutions | Police Custody |
Product series | HSL High security locks |
Service | Delivery |
Lochow Forensic Psychiatric Clinic
As a branch of the State Hospital for Forensic Psychiatry in Uchtspringe (Saxony-Anhalt, Germany), the Lochow Forensic Psychiatric Hospital has 80 places. About eight million euros were invested to convert a former Bundeswehr site for the tasks of the Maßregelvollzugs. It is located on an area of just under five hectares. Among other things, the facility houses patient rooms, service rooms as well as a kitchen and dining hall. The second main building, formerly a truck workshop, is available for occupational and sports therapy. Furthermore, there is a new building that houses the lock-secured entrance and exit area as well as the facility monitoring. The grounds are secured by a special fence. The fence is almost six metres high and made of NATO wire with climbing protection, detectors and camera surveillance.
Location | Lochow, Germany |
Room / Door | Passage door, Psychiatry patient door, Extra-secured detention door |
Solutions | Forensic Psychiatric Clinics |
Product series | HSL High security locks |
Service | Delivery |
Bad Cannstatt Local Court
The Bad Cannstatt (Baden-Wuerttemberg, Germany) district court was partially renovated during 2019. The subject of the work was the renovation of the courtrooms, the foyer and the projection booths.
Location | Bad Cannstatt, Germany |
Room / Door | Detention room door, Food Hatch |
Solutions | Court Custody |
Product series | HSL High security locks |
Service | Delivery |
Borna Local Court
The former Pestalozzi grammar school in Borna (Saxony, Germany) was converted and renovated to house the Borna district court. About 2,900 square metres of usable space are available for courtrooms, meeting rooms, offices and demonstration cells. A new entrance situation was created for use as a court. The facades, main staircase, corridors and the heart of the complex - an elaborately designed assembly hall - which serves as a courtroom, were renovated or restored in accordance with the requirements for the preservation of historical monuments.
Location | Borna, Germany |
Room / Door | Detention room door, Food Hatch |
Solutions | Court Custody |
Product series | HSL High security locks |
Service | Delivery |
Wuppertal-Ronsdorf Prison
After two years of construction, the Wuppertal-Ronsdorf correctional facility (North Rhine-Westphalia, Germany) was handed over to the justice system in June 2011. The facility has been in full operation since February 2012. The prison has 510 places in the closed prison system (310 for juvenile offenders / 200 for young prisoners on remand), which are distributed over four detention houses in two building complexes. In addition, there are gate and administration buildings, three factory buildings with 18 workshops, a kitchen building and a sports hall on the approximately 10-hectare grounds.
Location | Wuppertal, Germany |
Room / Door | Passage door, Detention room door, Outer gate, Food Hatch, Grid/fence door, Airlock door, Extra-secured detention door, Main entrance door, Service door, Sports facilities door, Administration door, Fire protection door, Smoke protection door |
Solutions | Correctional Services, Juvenile Correctional System |
Product series | HSL High security locks |
Service | Installation, Customised products, Delivery |
Magdeburg Regional Court
In 2016, the fundamental renovation of the old building began. After four years of construction, the 30.1 million euro renovation of the listed building was completed in 2020. During the renovation of the district court, safety, fire protection, monument preservation and energy requirements in particular had to be implemented. The projection booths were also brought up to the current state of security technology as part of the renovation.
Location | Magdeburg, Germany |
Room / Door | Detention room door, Food Hatch |
Solutions | Court Custody |
Product series | HSL High security locks |
Service | Delivery |
Diez Preventive Detention Centre
The new preventive detention building was constructed on the grounds of Diez Prison (Rhineland-Palatinate, Germany). The 19.5 million euro building offers space for 64 preventive detainees. In the four-storey building with a T-shaped floor plan, they have 18 square metre rooms, each with its own bathroom and a small kitchenette. The new building became necessary due to a decision by the Federal Constitutional Court in May 2011. The practice of executing preventive detention in prison buildings, which had been common in all federal states until then, was declared unconstitutional.
Location | Diez, Germany |
Room / Door | Passage door, Outer gate |
Solutions | Preventive Detention |
Product series | HSL High security locks |
Service | Delivery |
Prison Hospital Leipzig
The new prison hospital at Leipzig Prison (Saxony, Germany) replaces the existing prison hospital. The neighbouring listed buildings of the original detention hospital were built in 1913 and are limited by the structural possibilities. The new building will create a contemporary standard for the central medical care of prisoners. The capacity of the prison hospital will increase from 70 to 80 beds. Of these, 50 beds are allocated to psychiatry, 25 beds to somatics and 5 beds to a ward suitable for wheelchairs to accommodate elderly or disabled prisoners. The furnishings of the infirmaries largely correspond to those of regular detention rooms. The infirmary rooms offer more space to move the infirmary beds in and between the rooms. In addition to the infirmaries, an outpatient clinic with an X-ray room and two specially secured detention rooms for the accommodation of violent or suicidal prisoners will be built in the building. The construction costs for the new building are estimated at about 15.8 million euros.
Location | Leipzig, Germany |
Room / Door | Passage door, Detention room door, Food Hatch, Extra-secured detention door |
Solutions | Correctional Clinics |
Product series | HSL High security locks |
Service | Delivery |
LVR Clinic for Forensic Psychiatry Essen
The Clinic for Forensic Psychiatry at LVR-Klinikum Essen (North Rhine-Westphalia, Germany) has a total of 54 places. The facility is used for temporary placement in accordance with Section 126a of the Code of Criminal Procedure. Accordingly, patients are accommodated here if there are urgent reasons to believe that they have committed an unlawful act in a state of incapacity. Thus, the accommodation corresponds to a type of "pre-trial detention". The patients remain in the facility until their main hearing, after which they may be transferred to a psychiatric hospital.
Location | Essen, Germany |
Room / Door | Detention room door, Food Hatch |
Solutions | |
Product series | HSL High security locks |
Service | Customised products, Delivery |
Glückstadt Deportation Detention Facility
In 2018, Schleswig-Holstein, Mecklenburg-Western Pomerania and Hamburg decided to establish a joint detention centre for deportees in Glückstadt (Steinburg district). A total of 60 places are available in the 28 million euro facility on the grounds of a former barracks, 20 per federal state. Schleswig-Holstein is responsible for the construction and operation of the facility. The facility was opened in August 2021.
Location | Glückstadt, Germany |
Room / Door | Passage door, Detention room door, Airlock door |
Solutions | Detention Pending Deportation |
Product series | HSL High security locks |
Service | Delivery |
Partner | Franzen Feuerschutztüren GmbH |
Eichstätt Deportation Detention Facility
In June 2020, the operation of the detention centre for deportees began in the building of the former correctional facility. The Wilhelminian style building from 1900 was completely renovated and converted for detention pending deportation at a total cost of over seven million euros. The facility has 86 detention places for men and ten for women, divided between individual and communal detention rooms.
Location | Eichstätt, Germany |
Room / Door | Detention room door, Food Hatch |
Solutions | Detention Pending Deportation |
Product series | HSL High security locks |
Service | Delivery |
Partner | Sommer Fassadensysteme-Stahlbau-Sicherheitstechnik GmbH & Co. KG |
Düsseldorf Prison
Düsseldorf Prison (North Rhine-Westphalia, Germany) is located on a 125,000 square metre site in Ratingen. The facility has an occupancy capacity of 850 inmates and is mainly equipped with solitary confinement rooms. With construction costs of around 190 million euros, the facility is the largest investment in the NRW penal system in more than 60 years. Mechanical and motorised STUV high-security locks are used in the detention houses, visitor areas, sports halls and workshops as well as in the outer fences.
Location | Düsseldorf, Germany |
Room / Door | Passage door, Detention room door, Custody door, Outer gate, Technical room, Food Hatch, Grid/fence door, Sanitary room, Airlock door, Extra-secured detention door, Main entrance door, Service door, Sports facilities door, Administration door, Fire protection door, Smoke protection door |
Solutions | Correctional Services |
Product series | HSL High security locks |
Service | Installation, Delivery |
Partner | Sommer Fassadensysteme-Stahlbau-Sicherheitstechnik GmbH & Co. KG |
Lörrach Police Station
The state of Baden-Württemberg has invested around 3.1 million euros in the conversion of the former police headquarters into the Lörrach police station (Germany). The building was constructed in the 18th century and is a listed building. In compliance with corresponding requirements, new custody rooms and the guard area were accommodated on the ground floor as part of the police-friendly modernisation. The facility is designed for about 80 police officers in different areas of responsibility.
Location | Lörrach, Germany |
Room / Door | Passage door, Detention room door |
Solutions | Police Custody |
Product series | HSL High security locks |
Service | Delivery |
Partner | Teckentrup GmbH & Co. KG |
Bachtel Correctional Center
The Bachtel correctional center, which will be inaugurated in April 2021, has a floor area of 4,440 m² and is designed to accommodate up to 94 inmates. The correctional center is an institution of the Zurich correctional facilities specializing in the open execution of custodial and substitute custodial sentences. On the northeast side, the new two-story inmate wing with 52 places is located next to the existing inmate building from the 1960s. The construction costs amounted to 44.5 million CHF.
Location | Hinwil, Switzerland |
Room / Door | Detention room door, Food Hatch |
Solutions | Open Correctional System |
Product series | HSL High security locks |
Service | Delivery |